Licensed Building Practitioner - Rolleston, Selwyn, Christchurch and Mid Canterbury Call Adam: 027 444 5657
Freshly built timber deck with a post-and-rail balustrade beside a concrete block house, the decking still bright
Rolleston and Selwyn

Decks, Ramps and Outdoor Structures in Rolleston

Timber decks, access ramps with handrails, verandas and garden buildings - including the greenhouse in these photographs - built square, level and to last in the Canterbury weather.

Licensed Building Practitioner 26 years in the trade Owner operated by Adam Hayde Based in Rolleston, Selwyn

Outdoor Living That Lasts

Selwyn's sections are bigger than the city's, the summers are hot and dry, and the nor'wester comes across the plains with nothing to slow it down. A deck here has to be built for that: framing that will not twist, fixings that will not rust, boards spaced so they can move, and a structure that is bolted to the house properly rather than hung off the cladding. Hayde Construction builds decks, ramps, verandas and garden structures across Rolleston and Selwyn to be used for years, not admired for a season.

Adam is a carpenter and Licensed Building Practitioner, and outdoor timber work is the trade at its most visible - every joint and every board line is on show. The deck and ramp in our photographs, the balustrade on the block house, the veranda on the cottage and the timber greenhouse were all built by him.

What We Build

  • Timber decks. Ground-level and raised, attached to the house or freestanding, in treated pine, hardwood or a composite board, with the framing, piles and bearers sized for the span rather than for the price.
  • Access ramps and handrails. A ramp with a gentle gradient, a level landing at the door and a handrail on both sides makes a house usable for someone with a walker or a wheelchair, or simply for a parent who is finding the steps harder. The ramp in our photographs runs from the path to a new deck at the back door.
  • Balustrades and steps. Post-and-rail timber balustrades, stairs off a deck, and the handrails that go with them.
  • Verandas and covered decks. A roof over part of a deck, or a veranda along the front of an older house, so the outdoor space works in a nor'west wind and a summer sun as well as on a still evening.
  • Greenhouses, sheds and garden buildings. The timber-framed greenhouse in our gallery was built from the ground up - framing, polycarbonate cladding, roof vents, a door and tiers of staging inside. Sleepouts, sheds and studios follow the same approach.
  • Pet doors, gates and the small things. The jobs that finish a backyard off.

Consents, Heights and Barriers

Whether a deck needs a building consent comes down mostly to its height. The Ministry of Business, Innovation and Employment's guide to checking if you need a consent lists decks, platforms and bridges more than 1.5 metres above ground level among the work that needs one, so a low deck off a single-storey house in Rolleston usually does not, while a deck off an upper floor does. Separately, the Building Code's clause F4, safety from falling, requires a barrier wherever people could fall 1 metre or more, which is why a deck that is a metre off the ground gets a balustrade whether or not it needs a consent. Adam will tell you at the first visit which of these applies to your section, and build it accordingly.

A consent is not a reason to shrink a deck. It adds some time and a fee, and it means the structure is inspected and on the council's file, which is worth having when the house is sold. Where one is needed, Adam prepares the application as part of the job.

Timber, Fixings and Finish

Most decks in Selwyn are framed in treated pine and boarded in either treated pine, which is the economical choice and takes a stain well, or a hardwood such as kwila or vitex, which costs more, lasts longer and weathers to silver if it is left. Composite boards need no oiling and are worth considering for a deck in full sun. Fixings are stainless or hot-dip galvanised, never plain steel, and boards are fixed with proper decking screws rather than nails that lift in the first summer. A new deck wants a coat of oil or stain in its first year and a wash and recoat every couple of years after that; Adam will tell you what the timber you have chosen needs.

Contact Us

For a deck, a ramp, a veranda or a garden building anywhere in Rolleston, Lincoln, Prebbleton, West Melton, Darfield, Leeston, south-west Christchurch or Mid Canterbury, ring Adam on 027 444 5657 or send the details and a photo of the site through the form below. If the deck is part of a bigger change - a new door onto it, a wall coming out behind it - have a look at our home renovations and alterations page, and if an existing deck just needs boards, a rail or a rotten joist replaced, that is repairs and maintenance.

Stained timber veranda deck on the front of a weatherboard cottage
Before and after

From a Marked-Out Garden Bed to a Deck

The site beside the house marked out with spray paint, and the finished deck and balustrade built over it.

Before: a garden bed beside the house cleared and marked out with pink spray paint for the new deck
Before The spot marked out beside the house
After: the new timber deck and balustrade built over that spot
After The deck and balustrade built
Garden buildings

A Timber Greenhouse, Built From Scratch

Framed in timber, clad in twin-wall polycarbonate, with opening roof vents and two tiers of staging inside. The same way we would build a sleepout or a shed.

Timber framing of the greenhouse standing in the paddock before the polycarbonate went on

The framing

Set out, squared and braced before any cladding goes on. Get this right and everything that follows fits.

Finished timber and polycarbonate greenhouse in a paddock, low sun behind it

Clad and finished

Twin-wall polycarbonate for light and insulation, roof vents to let the heat out, and a proper door.

Inside a timber greenhouse, with two tiers of timber staging built along the polycarbonate wall

Staging inside

Two tiers of timber benches down the side so the space is used from the ground up.

Sunlit timber greenhouse standing in a paddock

Deck and Outdoor Structure Questions

Does my deck need a building consent?

Generally not if it is less than 1.5 metres above the ground, which covers most decks off a single-storey house. Above that, yes. A deck that is a metre or more off the ground needs a barrier either way. Adam will confirm which applies when he sees the site.

Pine, hardwood or composite?

Treated pine is the most economical and looks good stained. Kwila or vitex costs more and lasts longer. Composite needs the least upkeep and suits a deck in full sun. Adam can show you each from jobs he has done and price the options side by side.

How long does a deck take to build?

A straightforward deck is usually a few days to a week on site. Add a ramp, balustrades or a roof and it runs longer. A consent, where one is needed, adds council processing time before the build starts.

Can you build a ramp that meets the guidelines for a wheelchair?

Yes. A ramp for a wheelchair or walker wants a gentle gradient, a level landing at the door, handrails on both sides and a non-slip surface, and Adam will build it to suit the person using it and the space available. Where the ramp is part of a consented job, it is designed to the Building Code.

Do you build sleepouts and sheds?

Yes - the same way as the greenhouse in our photographs, from the framing up. Size and use decide whether a consent is needed; Adam will tell you before you decide on the size.

Get a quote

Talk to Adam About Your Job

Tell us what you have in mind and roughly where the house is. Adam will come and have a look, talk it through with you, and put a written quote in front of you - no obligation, anywhere in Rolleston, Selwyn, south-west Christchurch or Mid Canterbury.

027 444 5657
  • Rolleston, working across Selwyn, Christchurch and Mid Canterbury
  • Licensed Building Practitioner (Carpentry)
  • 26 years in the trade
  • Hayde Construction on Facebook

Photos help. A couple taken on your phone of the room, the deck site or the damage will let Adam give you a much more useful first answer.

Give Adam a call

027 444 5657

Hayde Construction, Rolleston